Panels comprising two walls of profiled (ribbed) sheet with an insulating core
This code is in the CBAM iron and steel sector.
- CBAM scope
- In scope
- Indirect emissions
- Not included
- Precursor
- No
- Published origins
- 33
Published default values
The current dataset contains 33 rows for this code. Total embedded emissions range from 1.89 to 8.25 tCO2e/t, depending on origin and production route. Where the Commission publishes a value at a shorter heading, the table names that heading.
| Origin | Published at | Route | Default value | 2026 cost/t |
|---|---|---|---|---|
| → | CN 7308 | C | 3.01 tCO2e/t | €152.89 |
| → | CN 7308 | C | 3.2 tCO2e/t | €170.10 |
| → | CN 7308 | E | 1.89 tCO2e/t | €159.83 |
| → | CN 7308 | C | 2.85 tCO2e/t | €138.40 |
| → | CN 7308 | C | 2.91 tCO2e/t | €143.84 |
| → | CN 7308 | C | 2.91 tCO2e/t | €143.84 |
| → | CN 7308 | C | 2.54 tCO2e/t | €110.33 |
| → | CN 7308 | C | 6.035 tCO2e/t | €426.81 |
| → | CN 7308 | C | 3.58 tCO2e/t | €204.51 |
| → | CN 7308 | C | 3.02 tCO2e/t | €153.80 |
| → | CN 7308 | C | 3.04 tCO2e/t | €155.61 |
| → | CN 7308 | C | 8.25 tCO2e/t | €627.38 |
| → | CN 7308 | C | 5.93 tCO2e/t | €417.30 |
| → | CN 7308 | C | 2.55 tCO2e/t | €111.24 |
| → | CN 7308 | C | 2.95 tCO2e/t | €147.46 |
| → | CN 7308 | C | 3.864 tCO2e/t | €230.22 |
| → | CN 7308 | C | 5.36 tCO2e/t | €365.69 |
| → | CN 7308 | E | 2.69 tCO2e/t | €232.27 |
| → | CN 7308 | E | 2.7 tCO2e/t | €233.17 |
| → | CN 7308 | C | 2.99 tCO2e/t | €151.08 |
| → | CN 7308 | C | 2.9 tCO2e/t | €142.93 |
| → | CN 7308 | E | 2.18 tCO2e/t | €186.09 |
| → | CN 7308 | C | 5.064 tCO2e/t | €338.88 |
| → | CN 7308 | C | 2.48 tCO2e/t | €104.90 |
| → | CN 7308 | C | 3.59 tCO2e/t | €205.41 |
| → | CN 7308 | E | 4.29 tCO2e/t | €377.15 |
| → | CN 7308 | C | 5.52 tCO2e/t | €380.18 |
| → | CN 7308 | C | 2.423 tCO2e/t | €99.74 |
| → | CN 7308 | C | 3.413 tCO2e/t | €189.38 |
| → | CN 7308 | C | 2.9 tCO2e/t | €142.93 |
| → | CN 7308 | E | 3.01 tCO2e/t | €261.24 |
| → | CN 7308 | C | 2.84 tCO2e/t | €137.50 |
| → | CN 7308 | C | 4.22 tCO2e/t | €262.46 |
DeutschVerbundplatten aus zwei Profilblechen und einer isolierenden Mittellage
FrançaisPanneaux multiplis constitués de deux parements en tôles nervurées et d'une âme isolante
Dataset 2026-10-19.451099948819. Scope: Annex I to Regulation (EU) 2023/956. The 2026 cost is the default value with the 2026 mark-up, minus 97.5% of the route's CBAM benchmark in Regulation (EU) 2025/2620, at the 2026-Q3 certificate price of €82.32.
Keep every import line on the current rule.
One call returns the scope, certificates, euro cost and filing date for a CN code. When the Commission changes a value, a webhook tells your system.
You get 3 free answers a day without an account. Plans start with a 7-day trial.