Electrolytically plated or coated with zinc
This code is in the CBAM iron and steel sector.
- CBAM scope
- In scope
- Indirect emissions
- Not included
- Precursor
- No
- Published origins
- 33
Published default values
The current dataset contains 33 rows for this code. Total embedded emissions range from 0.14 to 8.25 tCO2e/t, depending on origin and production route. Where the Commission publishes a value at a shorter heading, the table names that heading.
| Origin | Published at | Route | Default value | 2026 cost/t |
|---|---|---|---|---|
| → | CN 7212 | C | 2.68 tCO2e/t | €123.01 |
| → | CN 7212 | C | 3 tCO2e/t | €151.99 |
| → | CN 7212 | E | 0.14 tCO2e/t | €1.36 |
| → | CN 7212 | C | 2.29 tCO2e/t | €87.69 |
| → | CN 7212 | C | 1.73 tCO2e/t | €36.98 |
| → | CN 7212 | C | 1.51 tCO2e/t | €17.06 |
| → | CN 7212 | C | 2.05 tCO2e/t | €65.96 |
| → | CN 7212 | C | 3.205 tCO2e/t | €170.55 |
| → | CN 7212 | C | 2.89 tCO2e/t | €142.02 |
| → | CN 7212 | C | 3 tCO2e/t | €151.99 |
| → | CN 7212 | C | 2.5 tCO2e/t | €106.71 |
| → | CN 7212 | C | 8.25 tCO2e/t | €627.38 |
| → | CN 7212 | C | 4.28 tCO2e/t | €267.89 |
| → | CN 7212 | C | 1.94 tCO2e/t | €56.00 |
| → | CN 7212 | C | 2.13 tCO2e/t | €73.21 |
| → | CN 7212 | C | 2.144 tCO2e/t | €74.47 |
| → | CN 7212 | C | 5.36 tCO2e/t | €365.69 |
| → | CN 7212 | E | 1.53 tCO2e/t | €127.23 |
| → | CN 7212 | E | 0.47 tCO2e/t | €31.24 |
| → | CN 7212 | C | 2.81 tCO2e/t | €134.78 |
| → | CN 7212 | C | 2.43 tCO2e/t | €100.37 |
| → | CN 7212 | E | 0.74 tCO2e/t | €55.69 |
| → | CN 7212 | C | 4.101 tCO2e/t | €251.68 |
| → | CN 7212 | C | 2.641 tCO2e/t | €119.48 |
| → | CN 7212 | C | 3.59 tCO2e/t | €205.41 |
| → | CN 7212 | E | 2.331 tCO2e/t | €199.76 |
| → | CN 7212 | C | 2.51 tCO2e/t | €107.61 |
| → | CN 7212 | C | 2.333 tCO2e/t | €91.59 |
| → | CN 7212 | C | 2.544 tCO2e/t | €110.69 |
| → | CN 7212 | C | 1.44 tCO2e/t | €10.72 |
| → | CN 7212 | E | 3.21 tCO2e/t | €279.35 |
| → | CN 7212 | C | 2.37 tCO2e/t | €94.94 |
| → | CN 7212 | C | 4.22 tCO2e/t | €262.46 |
Deutschelektrolytisch verzinkt
Françaiszingués électrolytiquement
Dataset 2026-10-19.451099948819. Scope: Annex I to Regulation (EU) 2023/956. The 2026 cost is the default value with the 2026 mark-up, minus 97.5% of the route's CBAM benchmark in Regulation (EU) 2025/2620, at the 2026-Q3 certificate price of €82.32.
Keep every import line on the current rule.
One call returns the scope, certificates, euro cost and filing date for a CN code. When the Commission changes a value, a webhook tells your system.
You get 3 free answers a day without an account. Plans start with a 7-day trial.